The effect of percolation during the sinking process is also considered, and the sinking depth and the negative pressure required are determined.
考虑了负压下沉过程中渗流的影响,确立了桶内土柱顶部所需压力与下沉深度之间的对应关系。
Comparing with the calculating result of actual criterion, this article also presented the proper sinking depth of the single ling sinking piles, which can be used for reference in future project.
通过与现行规范计算结果相对比,对单排下沉式抗滑桩合理的下沉深度进行了探讨,为今后的工程应用提供借鉴。
应用推荐